Two KW30s on a Yorkshire farm
YorkshireTurbines
2 × KW30
Installed
Early 2026
Projected a year
183,488 kWh
Average wind speed
7.0 m/s
Two failed older turbines replaced with two new KW30s.
Real installations and real generation figures: Kodair turbines on farms and homes in England, Scotland and Ireland.
Two failed older turbines replaced with two new KW30s.
More than two years of recorded generation on a Scottish farm.
A single turbine making a major contribution to a farm’s electricity.
Strong generation for a high-demand home at a moderate wind site.
An ageing turbine replaced, on the site’s existing foundation.